Technical Analysis for BILN - Billington Holdings Plc

Grade Last Price % Change Price Change
A 540.00 -0.92% -5.00
BILN closed down 0.92 percent on Friday, April 26, 2024, on approximately normal volume. Due to the stock's strong uptrend, it may remain overbought for a while. So, if you're looking for a reason to sell, don't put too much weight on it being overbought.
0 Watchers
Watchlist Portfolio

Trend Table & Recent EOD Trading Signals

ADX Long Term Intermediate Term Short Term
Very Strong Up Up Up

Date Alert Name Type % Chg
Upper Bollinger Band Walk Strength 0.00%
Overbought Stochastic Strength 0.00%
Upper Bollinger Band Touch Strength 0.00%
New 52 Week Closing High Bullish -0.92%
Pocket Pivot Bullish Swing Setup -0.92%
New 52 Week High Strength -0.92%
Upper Bollinger Band Walk Strength -0.92%
Above Upper BB Strength -0.92%
Overbought Stochastic Strength -0.92%
Upper Bollinger Band Touch Strength -0.92%

   Recent Intraday Alerts

Alert Time
Possible Inside Day about 12 hours ago
Down 2% about 15 hours ago
Down 1% about 15 hours ago
Fell Below Upper Bollinger Band about 16 hours ago
Possible Pocket Pivot 1 day ago

Get a Trading Assistant

Let us help you stay on top of your investments. We will alert you to important technical developments on your portfolio & watchlist.

Profile

Billington Holdings Plc Description

Billington Holdings Plc is a United-Kingdom based holding company providing management services to its subsidiaries. The Company operates as a designer, manufacturer and installer of structural steelwork, through its subsidiaries, Billington Structures Limited and Peter Marshall Steel Stairs Limited, and as a supplier of safety solutions and barrier systems to the construction industry, through its subsidiary, easi-edge Limited. Billington Structures Limited's projects include Next Distribution Centre, Doncaster; Brize Norton Aircraft Hangar; Aldi Distribution Centre, Cardiff; One New Bailey, Salford, and Wellington Place, Leeds. easi-edge Limited's projects include C Sovereign Square, Leeds; Central Square, Leeds; St. James Road, Glasgow, and City Campus, Glasgow. Peter Marshall Steel Stairs Limited's projects include London School of Economics, London; University Technical College, Peterborough; Cornwall Energy Recovery Centre, St. Austell, and Sanger Institute, Cambridge.


Classification

Sector: Industrials
Industry: Engineering & Construction
Keywords: Energy Construction Retailers Retailing Steel Safety Aircraft Glasgow Structural Steel Supermarkets Omics Energy Recovery Marsh Aldi Billington Economics Norton Safety Solutions St. Austell

Is BILN a Buy, Sell or Hold?

Indicator Bull Case Neutral / Hold Bear Case
50 DMA
200 DMA
ADX Trend
Oversold / Overbought
Relative Strength

Indicators

Indicator Value
52 Week High 550.0
52 Week Low 282.5
Average Volume 28,080
200-Day Moving Average 388.40
50-Day Moving Average 436.21
20-Day Moving Average 484.38
10-Day Moving Average 511.50
Average True Range 22.02
RSI (14) 80.04
ADX 50.81
+DI 37.01
-DI 6.61
Chandelier Exit (Long, 3 ATRs) 483.94
Chandelier Exit (Short, 3 ATRs) 507.06
Upper Bollinger Bands 547.78
Lower Bollinger Band 420.97
Percent B (%b) 0.94
BandWidth 26.18
MACD Line 28.26
MACD Signal Line 23.16
MACD Histogram 5.0991
Fundamentals Value
Market Cap 69.45 Million
Num Shares 12.9 Million
EPS 0.56
Price-to-Earnings (P/E) Ratio 964.29
Price-to-Sales 0.59
Price-to-Book 1.69
PEG Ratio 0.00
Dividend 0.16
Dividend Yield 0.03%
Pivot Point Level Traditional / Classic Fibonacci Demark Woodie Camarilla
Resistance 4 (R4) 569.25
Resistance 3 (R3) 569.17 559.33 564.38
Resistance 2 (R2) 559.33 551.88 559.38 562.75
Resistance 1 (R1) 549.67 547.28 544.75 549.75 561.12
Pivot Point 539.83 539.83 537.38 539.88 539.83
Support 1 (S1) 530.17 532.38 525.25 530.25 518.88
Support 2 (S2) 520.33 527.78 520.38 517.25
Support 3 (S3) 510.67 520.33 515.63
Support 4 (S4) 510.75