Technical Analysis for ATM - AfriTin Mining Limited
Grade | Last Price | % Change | Price Change |
---|---|---|---|
C | 5.05 | 0.00% | 0.00 |
ATM closed unchanged on Thursday, April 25, 2024, on 1.33 times normal volume. The stock exhibited some range contraction during this trading session as price made an NR7 -- narrowest range of the last seven sessions.
Earnings due: May 1
*** please verify all earnings dates ***ADX | Long Term | Intermediate Term | Short Term |
---|---|---|---|
Strong | Down | Up | Down |
Date | Alert Name | Type | % Chg |
---|---|---|---|
Boomer Buy Setup | Bullish Swing Setup | 0.00% | |
NR7 | Range Contraction | 0.00% | |
Doji - Bullish? | Reversal | 0.00% | |
Wide Bands | Range Expansion | 0.00% | |
Wide Bands | Range Expansion | 0.00% | |
Wide Bands | Range Expansion | 2.02% | |
Overbought Stochastic | Strength | 2.02% | |
NR7 | Range Contraction | -4.72% | |
Inside Day | Range Contraction | -4.72% | |
Wide Bands | Range Expansion | -4.72% |
Alert | Time |
---|---|
Rose Above 10 DMA | about 16 hours ago |
Possible NR7 | about 17 hours ago |
Gap Down Closed | about 21 hours ago |
Reversed from Down | about 21 hours ago |
Gap Down Partially Closed | about 21 hours ago |
Free Daily (Stock) Chart Reading
Let us help you stay on top of your investments. We will alert you to important technical developments on your
portfolio & watchlist.
AfriTin Mining Limited is a Guernsey-based mining company. The Company is focused on mineral development with a portfolio of vanadium, tin, coal assets and other interests in Southern Africa. The Company’s projects include Uis Tin project and Mokopane Tin. The Uis Tin project consists of three project areas in the Erongo region of Namibia, all with historical production. The Mokopane Tin project is situated approximately 65 kilometers west of Polokwane and 45 kilometers north-northwest of Mokopane in the Mokopane District, Limpopo Province, South Africa. The Project contains historical resource estimates (non JORC compliant) of over 70,000,000 tonnes of mineralized pegmatite, with approximately 95,000 tonnes of contained tin as prepared by SRK Consulting in 198.
Sector: Basic Materials
Industry: Other Industrial Metals & Mining
Keywords: Mining Mineral Consulting Coal Mib Vanadium Limpopo Mokopane Pegmatite
Classification
Sector: Basic Materials
Industry: Other Industrial Metals & Mining
Keywords: Mining Mineral Consulting Coal Mib Vanadium Limpopo Mokopane Pegmatite
Indicator | Bull Case | Neutral / Hold | Bear Case |
---|---|---|---|
50 DMA | |||
200 DMA | |||
ADX Trend | |||
Oversold / Overbought | |||
Relative Strength |
Indicator | Value |
---|---|
52 Week High | 8.694 |
52 Week Low | 3.845 |
Average Volume | 2,890,508 |
200-Day Moving Average | 5.65 |
50-Day Moving Average | 4.59 |
20-Day Moving Average | 4.80 |
10-Day Moving Average | 5.09 |
Average True Range | 0.32 |
RSI (14) | 56.14 |
ADX | 30.27 |
+DI | 22.62 |
-DI | 14.66 |
Chandelier Exit (Long, 3 ATRs) | 4.59 |
Chandelier Exit (Short, 3 ATRs) | 5.05 |
Upper Bollinger Bands | 5.56 |
Lower Bollinger Band | 4.03 |
Percent B (%b) | 0.67 |
BandWidth | 31.86 |
MACD Line | 0.17 |
MACD Signal Line | 0.16 |
MACD Histogram | 0.0158 |
Pivot Point Level | Traditional / Classic | Fibonacci | Demark | Woodie | Camarilla |
---|---|---|---|---|---|
Resistance 4 (R4) | 5.46 | ||||
Resistance 3 (R3) | 5.45 | 5.31 | 5.39 | ||
Resistance 2 (R2) | 5.31 | 5.21 | 5.31 | 5.36 | |
Resistance 1 (R1) | 5.18 | 5.14 | 5.19 | 5.19 | 5.34 |
Pivot Point | 5.04 | 5.04 | 5.04 | 5.04 | 5.04 |
Support 1 (S1) | 4.91 | 4.94 | 4.92 | 4.92 | 4.76 |
Support 2 (S2) | 4.77 | 4.87 | 4.77 | 4.74 | |
Support 3 (S3) | 4.64 | 4.77 | 4.71 | ||
Support 4 (S4) | 4.65 |