Technical Analysis for HMI - Harvest Minerals Limited

Grade Last Price % Change Price Change
C 1.70 -8.11% -0.15
HMI closed unchanged on Wednesday, April 24, 2024, on 48 percent of normal volume.
0 Watchers
Watchlist Portfolio

Trend Table & Recent EOD Trading Signals

ADX Long Term Intermediate Term Short Term
Strong Up Up Down

Date Alert Name Type % Chg
MACD Bearish Signal Line Cross Bearish -8.11%
Boomer Buy Setup Bullish Swing Setup -8.11%
Narrow Range Bar Range Contraction -8.11%
Inside Day Range Contraction -8.11%
Wide Bands Range Expansion -8.11%
Inside Day Range Contraction -8.11%
Wide Bands Range Expansion -8.11%
Wide Bands Range Expansion -8.11%
NR7 Range Contraction -15.00%
Narrow Range Bar Range Contraction -15.00%

   Recent Intraday Alerts

Alert Time
Gap Down Closed about 5 hours ago
Reversed from Down about 5 hours ago
20 DMA Support about 5 hours ago
Fell Below Previous Day's Low about 6 hours ago
Down 5% about 6 hours ago

Get a Trading Assistant

Let us help you stay on top of your investments. We will alert you to important technical developments on your portfolio & watchlist.

Profile

Harvest Minerals Limited Description

Harvest Minerals Limited is a mineral exploration company. The Company holds exploration projects in Brazil. Its Capela Potash Project is located in the Sergipe State, Brazil, which hosts deposits of sylvinite and carnallitite. The Capela Potash Project consists of approximately eight mineral properties, which covers an area of over 11,210 hectares. Its Sergipe Potash Project is located in the Sergipe Basin and it covers an area of approximately 65 square kilometers. Its Mandacaru Phosphate Project is located in Ceara state, Brazil. Its Arapua Fertiliser Project is located in the State of Minas Gerais, approximately 400 kilometers south east of the Brazilian capital city Brasilia and within one of the agro-industrial centers of Brazil. The Arapua Fertiliser Project consists of over eight mineral properties with exploration licenses granted and covers an area of over 14,940 hectares. The Arapua Fertiliser Project is divided into three blocks: Arapua, Pindaibas and Maxixeblocks.


Classification

Sector: Basic Materials
Industry: Agricultural Inputs
Keywords: Chemistry Physical Sciences Mineral Minerals Mineral Exploration Mineral Properties Fertilizers Chemical Substances Phosphate Potash Capela Minas Gerais

Is HMI a Buy, Sell or Hold?

Indicator Bull Case Neutral / Hold Bear Case
50 DMA
200 DMA
ADX Trend
Oversold / Overbought
Relative Strength

Indicators

Indicator Value
52 Week High 7.2999
52 Week Low 0.6065
Average Volume 759,106
200-Day Moving Average 1.49
50-Day Moving Average 1.45
20-Day Moving Average 1.71
10-Day Moving Average 1.95
Average True Range 0.27
RSI (14) 57.63
ADX 44.04
+DI 30.30
-DI 13.74
Chandelier Exit (Long, 3 ATRs) 2.40
Chandelier Exit (Short, 3 ATRs) 1.90
Upper Bollinger Bands 2.30
Lower Bollinger Band 1.12
Percent B (%b) 0.62
BandWidth 68.70
MACD Line 0.14
MACD Signal Line 0.15
MACD Histogram -0.0039
Fundamentals Value
Market Cap 3.5 Million
Num Shares 189 Million
EPS 0.00
Price-to-Earnings (P/E) Ratio 0.00
Price-to-Sales 0.25
Price-to-Book 0.36
Pivot Point Level Traditional / Classic Fibonacci Demark Woodie Camarilla
Resistance 4 (R4) 2.03
Resistance 3 (R3) 2.05 2.01 2.00
Resistance 2 (R2) 2.01 1.96 2.00 1.99
Resistance 1 (R1) 1.93 1.94 1.91 1.91 1.98
Pivot Point 1.89 1.89 1.88 1.88 1.89
Support 1 (S1) 1.81 1.84 1.79 1.79 1.72
Support 2 (S2) 1.77 1.82 1.76 1.71
Support 3 (S3) 1.69 1.77 1.70
Support 4 (S4) 1.67