Technical Analysis for EDV - Endeavour Mining plc
Grade | Last Price | % Change | Price Change |
---|---|---|---|
C | 1847.00 | 0.22% | 4.00 |
EDV closed up 2.9 percent on Thursday, March 23, 2023, on 84 percent of normal volume. The stock exhibited some range contraction during this trading session as price made an NR7 -- narrowest range of the last seven sessions. The stock rose above its 50 day moving average, improving its intermediate-term outlook by crossing above that important trendline.
ADX | Long Term | Intermediate Term | Short Term |
---|---|---|---|
Weak or Absent | Up | Up | Up |
Date | Alert Name | Type | % Chg |
---|---|---|---|
Crossed Above 50 DMA | Bullish | 0.22% | |
NR7 | Range Contraction | 0.22% | |
Narrow Range Bar | Range Contraction | 0.22% | |
Above Upper BB | Strength | 0.22% | |
Gapped Up | Strength | 0.22% | |
Upper Bollinger Band Touch | Strength | 0.22% | |
Gapped Down | Weakness | 3.13% | |
New Downtrend | Bearish | 4.94% | |
Stochastic Sell Signal | Bearish | 4.94% | |
Overbought Stochastic | Strength | 4.94% |
Recent Intraday Alerts -- Get these alerts pushed to you via our Mobile App
Alert | Time |
---|---|
Upper Bollinger Band Resistance | about 2 hours ago |
Rose Above Upper Bollinger Band | about 5 hours ago |
Up 1% | about 5 hours ago |
Reversed from Down | about 5 hours ago |
Rose Above Previous Day's High | about 5 hours ago |
Get this analysis on your stocks daily!
Let us help you stay on top of your investments. We will alert you to important technical developments on your
portfolio & watchlist.
Configure default chart indicators
Basic chart:
Endeavour Mining Plc operates as a gold producer in West Africa. Its operating assets located in Senegal, Cote d'Ivoire, and Burkina Faso, as well as a portfolio of development projects and exploration assets in the Birimian Greenstone Belt across West Africa. Endeavour Mining Plc was incorporated in 2021 and is based in London, the United Kingdom.
Sector: Basic Materials
Industry: Gold
Keywords: Geology Burkina Faso Greenstone Belt Mining In Ghana Birimian Earth Sciences Geology Of Burkina Faso Geology Of Ivory Coast Gold Producer Mining In Mali
Classification
Sector: Basic Materials
Industry: Gold
Keywords: Geology Burkina Faso Greenstone Belt Mining In Ghana Birimian Earth Sciences Geology Of Burkina Faso Geology Of Ivory Coast Gold Producer Mining In Mali
Indicator | Bull Case | Neutral / Hold | Bear Case |
---|---|---|---|
50 DMA | |||
200 DMA | |||
ADX Trend | |||
Oversold / Overbought | |||
Relative Strength |
Indicator | Value |
---|---|
52 Week High | 177258.3421 |
52 Week Low | 585.1125 |
Average Volume | 364,933 |
200-Day Moving Average | 1716.99 |
50-Day Moving Average | 1828.50 |
20-Day Moving Average | 1735.65 |
10-Day Moving Average | 1757.70 |
Average True Range | 67.02 |
RSI | 57.63 |
ADX | 23.02 |
+DI | 27.53 |
-DI | 25.34 |
Chandelier Exit (Long, 3 ATRs) | 1684.96 |
Chandelier Exit (Short, 3 ATRs) | 1724.05 |
Upper Bollinger Bands | 1843.24 |
Lower Bollinger Band | 1628.06 |
Percent B (%b) | 1.0 |
BandWidth | 12.40 |
MACD Line | -1.71 |
MACD Signal Line | -20.33 |
MACD Histogram | 18.6132 |
Pivot Point Level | Traditional / Classic | Fibonacci | Demark | Woodie | Camarilla |
---|---|---|---|---|---|
Resistance 4 (R4) | 1892.97 | ||||
Resistance 3 (R3) | 1889.52 | 1869.42 | 1884.64 | ||
Resistance 2 (R2) | 1869.42 | 1856.69 | 1871.14 | 1881.86 | |
Resistance 1 (R1) | 1856.21 | 1848.83 | 1862.81 | 1859.66 | 1879.09 |
Pivot Point | 1836.10 | 1836.10 | 1839.41 | 1837.83 | 1836.10 |
Support 1 (S1) | 1822.90 | 1823.38 | 1829.50 | 1826.34 | 1806.91 |
Support 2 (S2) | 1802.79 | 1815.52 | 1804.51 | 1804.14 | |
Support 3 (S3) | 1789.58 | 1802.79 | 1801.36 | ||
Support 4 (S4) | 1793.03 |